![HLE-108-02-L-DV-BE HLE-108-02-L-DV-BE](https://www.mouser.com/images/samtec/lrg/hle-102-02-f-dv_SPL.jpg)
HLE-108-02-L-DV-BE Samtec
auf Bestellung 46 Stücke:
Lieferzeit 10-14 Tag (e)
Anzahl | Preis ohne MwSt |
---|---|
1+ | 8.11 EUR |
10+ | 7.8 EUR |
112+ | 6.49 EUR |
504+ | 5.51 EUR |
1008+ | 4.7 EUR |
2520+ | 4.31 EUR |
5012+ | 4.24 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details HLE-108-02-L-DV-BE Samtec
Description: CONN RCPT 16POS 0.1 GOLD SMD, Packaging: Tube, Connector Type: Receptacle, Bottom Entry, Voltage Rating: 400VAC, Current Rating (Amps): 4.1A per Contact, Mounting Type: Surface Mount, Number of Positions: 16, Style: Board to Board, Operating Temperature: -55°C ~ 125°C, Contact Type: Female Socket, Fastening Type: Push-Pull, Number of Positions Loaded: All, Termination: Solder, Insulation Color: Black, Pitch - Mating: 0.100" (2.54mm), Contact Finish - Mating: Gold, Contact Finish Thickness - Mating: 10.0µin (0.25µm), Contact Finish - Post: Tin, Part Status: Active, Insulation Height: 0.144" (3.66mm), Row Spacing - Mating: 0.100" (2.54mm), Number of Rows: 2.
Weitere Produktangebote HLE-108-02-L-DV-BE nach Preis ab 7.29 EUR bis 9.12 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis ohne MwSt | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
HLE-108-02-L-DV-BE | Hersteller : Samtec Inc. |
![]() Packaging: Tube Connector Type: Receptacle, Bottom Entry Voltage Rating: 400VAC Current Rating (Amps): 4.1A per Contact Mounting Type: Surface Mount Number of Positions: 16 Style: Board to Board Operating Temperature: -55°C ~ 125°C Contact Type: Female Socket Fastening Type: Push-Pull Number of Positions Loaded: All Termination: Solder Insulation Color: Black Pitch - Mating: 0.100" (2.54mm) Contact Finish - Mating: Gold Contact Finish Thickness - Mating: 10.0µin (0.25µm) Contact Finish - Post: Tin Part Status: Active Insulation Height: 0.144" (3.66mm) Row Spacing - Mating: 0.100" (2.54mm) Number of Rows: 2 |
auf Bestellung 130 Stücke: Lieferzeit 10-14 Tag (e) |
|