![C1206C103J3GEC7800 C1206C103J3GEC7800](https://mm.digikey.com/Volume0/opasdata/d220001/medias/images/208/1206-%283216-Metric%29-3%2C20x1%2C60x1%2C00mm.jpg)
C1206C103J3GEC7800 KEMET
![C1206C103J3GEC7800](/images/adobe-acrobat.png)
Description: CAP CER 1206 10NF 25V C0G 5%
Packaging: Tape & Reel (TR)
Tolerance: ±5%
Features: Low ESL, Low ESR
Voltage - Rated: 25V
Package / Case: 1206 (3216 Metric)
Temperature Coefficient: C0G, NP0
Size / Dimension: 0.126" L x 0.063" W (3.20mm x 1.60mm)
Mounting Type: Surface Mount, MLCC
Operating Temperature: -55°C ~ 125°C
Applications: ESD Protection
Thickness (Max): 0.039" (1.00mm)
Part Status: Active
Capacitance: 10000 pF
auf Bestellung 4000 Stücke:
Lieferzeit 10-14 Tag (e)
Anzahl | Preis ohne MwSt |
---|---|
4000+ | 0.17 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details C1206C103J3GEC7800 KEMET
Description: CAP CER 1206 10NF 25V C0G 5%, Packaging: Tape & Reel (TR), Tolerance: ±5%, Features: Low ESL, Low ESR, Voltage - Rated: 25V, Package / Case: 1206 (3216 Metric), Temperature Coefficient: C0G, NP0, Size / Dimension: 0.126" L x 0.063" W (3.20mm x 1.60mm), Mounting Type: Surface Mount, MLCC, Operating Temperature: -55°C ~ 125°C, Applications: ESD Protection, Thickness (Max): 0.039" (1.00mm), Part Status: Active, Capacitance: 10000 pF.
Weitere Produktangebote C1206C103J3GEC7800 nach Preis ab 0.19 EUR bis 0.74 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis ohne MwSt | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() |
C1206C103J3GEC7800 | Hersteller : KEMET |
![]() Packaging: Cut Tape (CT) Tolerance: ±5% Features: Low ESL, Low ESR Voltage - Rated: 25V Package / Case: 1206 (3216 Metric) Temperature Coefficient: C0G, NP0 Size / Dimension: 0.126" L x 0.063" W (3.20mm x 1.60mm) Mounting Type: Surface Mount, MLCC Operating Temperature: -55°C ~ 125°C Applications: ESD Protection Thickness (Max): 0.039" (1.00mm) Part Status: Active Capacitance: 10000 pF |
auf Bestellung 5653 Stücke: Lieferzeit 10-14 Tag (e) |
|