CAF-A751B-224-410 Same Sky (Formerly CUI Devices)
Hersteller: Same Sky (Formerly CUI Devices)
Description: AC FAN, 172 X 150 X 51, 220 ~ 24
Packaging: Box
Power (Watts): 28.10W
Voltage - Rated: 220VAC
Size / Dimension: Rectangular/Rounded - 172mm L x 151.5mm H
Bearing Type: Ball
RPM: 2200 RPM
Air Flow: 140.8 CFM (3.94m³/min)
Width: 51.50mm
Operating Temperature: 14 ~ 158°F (-10 ~ 70°C)
Termination: 2 Wire Leads
Approval Agency: CE, cURus, TUV
Fan Type: Tubeaxial
Noise: 49.0dB(A)
Static Pressure: 0.170 in H2O (42.3 Pa)
Description: AC FAN, 172 X 150 X 51, 220 ~ 24
Packaging: Box
Power (Watts): 28.10W
Voltage - Rated: 220VAC
Size / Dimension: Rectangular/Rounded - 172mm L x 151.5mm H
Bearing Type: Ball
RPM: 2200 RPM
Air Flow: 140.8 CFM (3.94m³/min)
Width: 51.50mm
Operating Temperature: 14 ~ 158°F (-10 ~ 70°C)
Termination: 2 Wire Leads
Approval Agency: CE, cURus, TUV
Fan Type: Tubeaxial
Noise: 49.0dB(A)
Static Pressure: 0.170 in H2O (42.3 Pa)
auf Bestellung 159 Stücke:
Lieferzeit 10-14 Tag (e)
Anzahl | Preis ohne MwSt |
---|---|
1+ | 64.13 EUR |
20+ | 58.58 EUR |
40+ | 56.35 EUR |
60+ | 52.65 EUR |
100+ | 48.57 EUR |
Produktrezensionen
Produktbewertung abgeben
Technische Details CAF-A751B-224-410 Same Sky (Formerly CUI Devices)
Description: AC FAN, 172 X 150 X 51, 220 ~ 24, Packaging: Box, Power (Watts): 28.10W, Voltage - Rated: 220VAC, Size / Dimension: Rectangular/Rounded - 172mm L x 151.5mm H, Bearing Type: Ball, RPM: 2200 RPM, Air Flow: 140.8 CFM (3.94m³/min), Width: 51.50mm, Operating Temperature: 14 ~ 158°F (-10 ~ 70°C), Termination: 2 Wire Leads, Approval Agency: CE, cURus, TUV, Fan Type: Tubeaxial, Noise: 49.0dB(A), Static Pressure: 0.170 in H2O (42.3 Pa).
Weitere Produktangebote CAF-A751B-224-410 nach Preis ab 49.4 EUR bis 66.39 EUR
Foto | Bezeichnung | Hersteller | Beschreibung |
Verfügbarkeit |
Preis ohne MwSt | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
CAF-A751B-224-410 | Hersteller : CUI Devices | AC Fans |
auf Bestellung 160 Stücke: Lieferzeit 10-14 Tag (e) |
|